A batch of planning function into constructinga deckbeyond choosing your deck size and supply . Even if you choose to build your deck with mellow - quality , weather - resistant materials , the constituent can impact and diminish the deck of cards ’s quality over clock time if care is not also applied when preparing the deck site . Certain ground cover are better beseem for use with deck than others .

Purpose

Most deck installment companies recommend using crushed rock when installing a deck . Gravel provides ample drainage and prevents pool of body of water from lingering below the deck structure after it rain down , and erode the wood social organisation and foundation . pebble and wood french-fried potatoes are option to gravel as other suited Earth’s surface choice , which also earmark for adept drain .

When to Apply

You should put a layer of gravel down before you build your deck rather than waitress until your deck is stop , states the Masterpiece Construction website . Once the deck is complete , it might be too low to the ground to by rights spread the crushed rock foundation . A gravel coating ensure the structure is built on a self-coloured , insipid foundation .

Ready the Deck Site

The final step of preparing the pack of cards situation involves applying a layer of gravel to the background control surface . It occurs after you take about 3 inches of grass from the area in which you contrive to build up your deck . You want to bring out the bare ground in a space that is around 2 foot bigger than the planned pack of cards size to assign for the deck of cards fantasm that may trammel grass growth . Cover the bare ground with a polyethylene film to discourage weed increase . propagate a layer of gravel over top of the polyethylene movie .

Secure Deck Footings

The role of gravel secures deck footing — pressure treat woods columns that serve as part of the deck ’s support structure . Dig a hole of at least 36 inches . Place about 6 in of gravel into the pickle along with a wood footer home base . Position the columns in an erect office . Plug the station hole with tack layers of gravel and grease , and tightly pack each one as you go until the jam is completely fill . The column should be straight and inflexible once done .

References

Gravel Background

Installing Wood on Deck

Pine Deck

Installing New Deck

Worker Installing Cedar Deck